Extension Of Jericho Resort Village
| Project Name | Extension Of Jericho Resort Village |
|---|---|
| Owner | Jericho Resort Village Co. |
| Donor | Jericho Resort Village Co. |
| Design Firm | Madar Consulting Engineers |
| Supervision Firm | Madar Consulting Engineers & Diamond Electromechanical |
| Start Date | March -2023 |
| Finish Date | March -2025 |
| Project Area | 7900 sqm |
Al-Mosleh & Atlantic Contracting Company successfully Extension Of Jericho Resort Village . Tourist Resort Expansion Project, which was implemented as an extension to the existing building. The project was completed with great care and precision. It consists of a basement level, ground floor, five above-ground floors, and a roof, with the basement level containing open halls for events, the ground floor including a restaurant, kitchen, and central laundry, and the upper floors housing 75 hotel rooms, each equipped with sanitary facilities and bathrooms.
The scope of work included excavation and removal of debris to designated locations, reinforced concrete works (structural frame), and electrical and mechanical installations, followed by tiling works, and then painting works, suspended ceilings, metal works, aluminum works, glass works, and carpentry works, all executed in accordance with approved engineering and tourism standards.
In addition, the project included external works, such as canopies, asphalt paving, tiling of outdoor areas, and steel structure works, ensuring the completion of the project with the highest quality in compliance with technical and engineering requirements.